Laserfiche WebLink
Development of the Guptil site, per the recommendations outlined in the study, could-begin in <br />the Spring of 2004. <br />The study group should include, at a minimum, representatives of the McCarron# s Lake <br />Neighborhood, affected property owners, developers? the HRA and Planning ConurAssion. <br />Progress reports on the study process will be provided (and posted on the city web site) to all <br />STAFF., HRA and COMMIISSION ASSISTANCE <br />The Community Development and HRA staff will be assigned to administer the study process. <br />An HRA board member and Planning Commission member will be assigned as public officials <br />assigned to co- chair the study. <br />INTERIM MAINTENANCE AT 185 N. McCARRONS BOULEVARD <br />Dennis Guptil (attached letter) has agreed to maintain the pr p r ,� . at 185 North M(.,.Carrons, <br />Boulevard to meet the City of Roseville property standards: <br />1. regularly mow the grass to a <br />height of S inches or less <br />2. Regularly pick up debris such a <br />leaves, limbs and garbage on the <br />site <br />3. Maintain the integrity of the <br />building shell against weather and <br />vandalism. <br />1 \Vie[oria\CommDev\Specia1 PfajecLALMcCarrans Neighbarh Overview of study,doc <br />5 <br />