Laserfiche WebLink
The total cost of the project, depending on what option is desired, ranges from $56,209.12 to <br />$71,223.38. The following is a sumn my of the project costs for Option 4: <br />Installation of g lights ................... ....... ........a....................., .....................$41,785.00 <br />(2 light poles at no charge because light can he placed on existing wooden poles) <br />Energy/Maintenance Cost of 7 lights ........ ............................... F .. r ad mom *add m m a$ 2:0963.99 <br />Engineering, Legal & Admirlistrative Fees ................................................ $6,474.89 <br />TOTAL ■..*■■.....■■..•.... End .....■ mean own ......mass ..a...Ong ■..■.■+.. *seems ....... r..m...+..,..71 9223,38 <br />8 <br />Assessmentper ���#+.. �.... �■■.■.....■.............. ����.* s,. ���■■ �*■■■■■■ ■ ■a■i ■ ■ ■r.« + ■ ■ ■.t.. +�.F ■� +.t�.. ��.3� <br />The existing lights along Fairview Avenue appear to he adequate for the residential properties on the <br />east side, as a result, staff does not recommend assessing these parcels. <br />RECOMMENDED COUNCIL ACTION: <br />Approval of a resolution ordering Project UL -03 -11 and directing the improvement to he installed. <br />or <br />Denial of ordering Project L -03 -1 u1 <br />or <br />Continuation of ordering Project UL -03 -11 until a further date <br />Prepared By: Debra Bloom <br />