My WebLink
|
Help
|
About
|
Sign Out
Home
2003_0407_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2003
>
2003_0407_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2011 1:08:05 PM
Creation date
10/21/2011 12:54:22 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
$1.15 million, including reconfiguring office furniture. Staff is seeping direction on proceeding <br />with this project. <br />Staff Recommendation: To approve the projects as proposed and presented. Authorize <br />completion of detailed drawings and specifications and to return to the Council with hid <br />packages to meet the project schedule. <br />RECOMMENDED COUNCIL ACTION: <br />1. Motion approving the Police and Public 'works Maintenance Proj ect as presented, and <br />authorizing Ankeny Kell Architects to proceed with detailed design development consistent <br />with the foregoinga with funding to come from the proceeds of the voter - approved bond issue <br />and the wilding Replacement Fund in a riot -to- exceed mount of $10.4 million. <br />2. Motion authorizing the development of plans and specifications for renovating the existing <br />City lull as presented, including the proposed transfer of the Parrs Department, Fire <br />Administration, and Information Technology units into City Hall, with funding to come from <br />the Building Replacement Fund in a riot -to- exceed amount of $1. 15 million. <br />Prepared Bar: Duane Schwartz <br />
The URL can be used to link to this page
Your browser does not support the video tag.