Laserfiche WebLink
specified on the plans submitted for CUP consideration and must not exceed <br />2 feet by 20 feet or Zoo square feet in size_ All utility wires or lines leading to the <br />3 monopole from the equ ipmcnt shelter must be buried. <br />4 <br />5 c) The area surrounding the equipment shelter must be screened with either a fence <br />6 and/or landscaping. If landscaping is selected, plant material must be installed on <br />7 the south, west, east sides of monopole /equipment area at a minimum height of <br />8 five feet except accent shrubs); 75% of this plant screen must be coniferous. A <br />9 complete landscape plan must be prepared as part of the building permit <br />10 application and approved by the City prier to issuance of the building permit. <br />11 <br />12 d) The monopole is to be limited to the single user /applicant (Qwest Wire less). <br />13 Future antenna additions will require an amendment to the approved CUR, <br />14 <br />15 e) The Frank's Nursery & Crafts site is limited to one communication <br />16 monopole /antenna/tower. <br />17 <br />18 f) The monopole must not be lighted; however, the former parking lot light can be <br />19 re- installed to the necessary height. <br />20 <br />1 g) Electric and phone wires serving the equipment and monopole must be buried. <br />2 <br />2 Parking of maintenance vehicles roust occur in the off-street street parking space <br />4 directly adjacent to the equipment shelter. <br />25 <br />26 i) The 54 foot tall monopole and supporting cquiprnent must be completely removed <br />7 from the site by the applicant (rest wireless) if 1.) operations cease. .) the <br />8 equipment is damaged or unsafe as determined by the Roseville Building Official. <br />29 3. the CUP elapses or is determined to be in violation by the Community <br />30 Development Director. The City may require the applicant Qwest wireless) to <br />31 post a bond to assure timely removal of the monopole and supporting equipment. <br />3 <br />33 a) This conditional use permit shall expire 6 months after approval if a building <br />34 permit has not been issued. (Section 1013.03) <br />35 <br />36 Barry Co lernan, Qwest wireless, explained that the pole with a light will be installed in <br />37 the corner. The tree would be moved or replaced in a different area. The equipment box <br />38 is twice the size of a street -side traffic equipment control box. The equipment box is 5 <br />39 feet tall. <br />40 <br />41 Member Stone asked for c lari f 1c ation of the location of trees. <br />42 <br />43 Member Mulder asked if line of sight is a problem. (no, coverage along Hwy. 36 can be <br />44 maintained), <br />45 <br />46 Chair Duncan closed the hearing. <br />