My WebLink
|
Help
|
About
|
Sign Out
Home
2003_0630_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2003
>
2003_0630_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2011 3:02:21 PM
Creation date
10/21/2011 2:49:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DISCUSSION of BIDS: <br />Item A.I. Awarding Contracts Based on Second Bid Package <br />Attached are the reconuYendation letters from Mc Gough for each of the five bid groups in Bid <br />Package #2. The recommended low bidders are as follows: <br />Bid Group 3 ' xcavation and Demolition <br />Imperial Developers} Inc.- $1483900 <br />Bid Group 4 Cast -in -Place Concrete <br />teenbgEg- watrud Construction 47�,��� <br />Bid Group 5 ::ire -cast Concrete <br />Hanson Spancrete Midwest $690,000 <br />Bid Group 6 Structural Steel Fabrication <br />American Structural Metals $192,795 <br />Bid Group 7 Steel Erection <br />Western Steel Erection 9 y <br />Item A.2. Environmental Abatement Contract. <br />Bids were received from three firms for asbestos and lead abatement. Their are as follows: <br />Envirotech 522,280 <br />Champion Environmental $28P750 <br />Red Pine Industries $471149 <br />Staff' recommends accepting the low }yid from Envirotech for this work. <br />Item .3. Purchase of Vehicle Lift <br />Quotations were received from four companies for various capacity vehicle lifts. Staff <br />recommends the low quote from Carney Sales for (1) 96,000 pound truck lift and (1) four -post, <br />light -duty vehicle lift for a total cast including tax of $45,198. <br />FINANCULL IMPLICATIONS: <br />The bids received for all categories in Items 1 through 3 fall within the estimated budget for this <br />portion of the project. we are committed to delivering this project within the overall amount <br />approved by ity Council. <br />
The URL can be used to link to this page
Your browser does not support the video tag.