My WebLink
|
Help
|
About
|
Sign Out
Home
2003_0630_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2003
>
2003_0630_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2011 3:02:21 PM
Creation date
10/21/2011 2:49:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
McGough Construction Five Generations <br />2737 Fairview Avenue North Building Confidence <br />St. Paul, Minnesota 551 13-1372 <br />Phone (651) 633 -5050 Fax (d51) 633 -5673 <br />June 30, 2003 <br />City of Roseville <br />Mr. Duane Schwartz via fax 651-490-2275 <br />2660 Civic Center Drive <br />Roseville,, Minnesota 55 113 <br />Re: City of Roseville City Hall & Public works Pr_ t <br />Bid Package #2, Rid Group ##5 Award Letter — Hanson Spancrete Midwest Inc. <br />Precast Concrete <br />Dear Duane: <br />Following analysis of the responses to our Request for Proposal # (RFP ##2) for the precast concrete <br />work for the project listed above, we recommend awarding the work to Hanson Spancrete Midwest, <br />Inc. based on their initial low hid of $690 }000 for Bid Group #5. All proposals were in accordance <br />with the Request for Proposal documents and its requirements. A brief timeline of the entire proposal <br />and review process follows: <br />Proposals received from two bidders on June 18, 2003. <br />Copies of each proposal received were provided to the City of Roseville on June 18, 2003. <br />A proposal spreadsheet for scope review was generated by Mc Gough and if necessary, brought to <br />e uilibrium. This recommended contractor was the initial loin bidder. <br />Numerous conversations were held with the low bidder to verify scope. <br />A meeting was held with the lour bidder on ,dune 24, 2003 to review scope. <br />.Again, we received a total of two competitive responses. Once we receive your formal approval we will <br />notify the selected subcontractor and immediately begin to draft a copy of a subcontract for your review. <br />Sincerely, <br />McGougb� Constr coon <br />ustinake <br />Project Manager <br />cc: File — 034 10 <br />Jim Frisell - Mc Gough Construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.