My WebLink
|
Help
|
About
|
Sign Out
Home
2003_0630_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2003
>
2003_0630_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2011 3:02:21 PM
Creation date
10/21/2011 2:49:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
McGough Construction Five Generations <br />2737 Fairview Avenue North Building Confidence <br />St. Paul, Minnesota 55113 -1372 <br />Phone (651) 633 -5050 Fax (651) 633 -5673 <br />June 30., 2003 <br />City of Roseville <br />Mr. Duane Schwartz via fax 651490 -2275 <br />2660 Civic Center Drive <br />Roseville, Minnesota 55113 <br />Re: City_ of Roseville City Mall & Public Works Proi ect <br />Bid Package #2, Bid Group #4 Award Letter — Steenberg — Watrud Construction � LLC <br />Concrete <br />Dear Duane: <br />Following analysis of the responses to our Request for Proposal N2 (RF P 2) for the Concrete work <br />for the project listed above, we recommend awarding the work to Steenberg - watrud Construction, <br />LLC based on their initial low bid of $478,000 for Bid Group #4. All proposals were in accordance <br />with the Request for Proposal documents and its requirements. A brief timeline of the entire proposal <br />and review process follows: <br />• Proposals received from five bidders on ,tune 18, 2 003 . <br />• Copies of each proposal received were provided to the City of Roseville on ,tune 18, 2003 <br />• A proposal spreadsheet for scope review was generated by McGough and if necessary, brought to <br />equilibrium. This recommended contractor was the initial low bidder. <br />post proposal RFI was sent out to all bidders on .Tune 19, 2003 discussing the bid scope. <br />Again, we received a total of four competitive responses. Once we receive your formal approval we will <br />notify the selected subcontractor and immediately begin to draft a copy of a subcontract for your review. <br />Sincerely, <br />McGou h Cons t ucfion <br />Z-1ustin Sc wake <br />Project Manager <br />cc: Pile — 03300 <br />Jim Frisell - l c ough Construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.