My WebLink
|
Help
|
About
|
Sign Out
Home
2003_0630_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2003
>
2003_0630_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2011 3:02:21 PM
Creation date
10/21/2011 2:49:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
McGough Construction <br />Fairview Avenue North <br />St. Paul, Minnesota 55113-1372 <br />Phone (651) 633-5050 Fax (651) 633-5673 <br />June 3 ox 2003 <br />City of Roseville <br />Mr. Duane Schwartz <br />2660 Civic Center Drive <br />Roseville, Minnesota 55113 <br />via fax 651- 490 -2275 <br />Five Generations <br />Building Confidence <br />Re. i of Roseville City Hall & Public works Pro'ect <br />Bid Package #2, Bid Group if Award Fetter -- western Steel Erection, Inc. <br />Steel Erection <br />Dear Duane: <br />Following analysi's of the responses to our Request for Proposal ##2 (RFP #2) for the steel erection <br />work for the project listed above, we recommend awarding the work to western Steel Erection based <br />on their initial low bid of $97,338 for Bid Group #6. All proposals were in. accordance with the <br />Request for Proposal documents and its requirements. A brief timeline of the entire proposal and <br />review process follows: <br />• Proposals received from three bidders on June 18, 2003. <br />• Copies of each proposal received were provided to the City of Roseville on June 18, 2003 <br />• A proposal spreadsheet for scope review was generated by McGough and if necessary, brought to <br />equilibrium. This recommended contractor was the initial love bidder. <br />1b A post proposal RFI was sent out to all bidders on June 19, 2003 clarifying the hid scope. <br />Again, we received a total of three competitive responses. once we receive your formal approval we will <br />notify the selected subcontractor and intermediately begin to draft a copy of subcontract for your review. <br />Sincerely, <br />Mc ou In Con truction <br />L;ustin chwake <br />Project Manager <br />cc: File 05120 <br />Jim Frisell - Mc Gough Construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.