My WebLink
|
Help
|
About
|
Sign Out
Home
2003_0609_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2003
>
2003_0609_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2011 7:12:06 AM
Creation date
10/21/2011 3:10:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Project Overview <br />North Heights Lutheran Church is proposing the construction of a new 1,200 seat <br />Sanctuary and K- School to replace their existing 400 seat Sanctuary and K-8 <br />School on the existing site. The site for this campus is located on the northwest <br />quadrant of Rice Street and County Road C in Roseville, MN. The proposed 134,930 <br />s . f. building footprint will be located on the existing 11.4 acre site <br />The site work includes parking, landscaping and playing fields. <br />B. Project Description: <br />It is the desire of North Heights Lutheran Church to serve our community with <br />spiritual life and growth in all areas the church serves. Forth Heights Christian <br />Academy has outgrown the present facilities and needs upgraded facilities to fully <br />serve its purposes. The church facilities are outdated and insufficient to meet the <br />needs of the future. <br />The proposed three story School with a basement world he located on the southeast <br />corner of the site. When the K-12 school grows to capacity, there would be three <br />classrooms of 20-25 students for each grade level with special activity support spaces <br />includipg, library, science labs and administration. Students will not be bused to <br />school and busing is planned for special off site classes or activities only. Student <br />parking would he off-street parking by permit only. <br />The proposed central one story support space would connect the School and the <br />Sanctuary. This area of the hui ldi ng would include the shared functions of a i tchen, <br />Cafeteria/Fellowship Fall} Meeting Rooms* Classrooms, a 400 seat gym, 750 seat <br />auditorium and an area for Day Care. <br />The proposed Sanctuary and two story support areas would be located in the north end <br />of the building. This area of the building would include a 1,200 seat Sanctuary, <br />Offices, Meeting Rooms and Classrooms. <br />Exterior finish materials are masonry and metal window and door systems. <br />The site consists of two parking lots. A north lot with 334 parking spaces and a south <br />lot with 83 parking spaces. The soccer field and softball field will overlap each other. <br />The remainder of the site will be the proposed building and landscaped green space. <br />C. Project Phasing: <br />The construction for this project is proposed to be completed in two phases. <br />Phase 1 would be the demolition of the south portion of the existing three story <br />School and construction of the new three story K-12 School, 750 seat Auditorium, 83 <br />new parking spaces and associated site work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.