Laserfiche WebLink
City Criteria: The minimum number of overstory trees on any riven site shall he <br />one overstory tree per fifty feet (50') of parking lot frontage plus trees required for <br />parking lot islands. <br />• Proposed: The minimum number of overstory trees required for the site is 69. <br />The proposed plan contains 69 overstory or evergreen trees. <br />• Notes: fleets city criteria. <br />City Criteria: Plant size requirements are as follows: <br />2.551 = deciduous and ornamental trees <br />6' ht. = evergreen trees <br />5 gal. = potted shrubs <br />o Proposed. The proposed plant schedule follows these plant size requirements. <br />Dotes: Meets city criteria. <br />Drainage ( 1009.04, Roseville Stormwater Management Program) <br />City Criteria: Dispose of all surface water on off- street parking areas and other <br />impervious areas. <br />❑ Proposed: The Drainage system will consist of catch basins and piping to <br />.collect the storm water runoff from both parking lots, and roof drainage. The <br />storm surer system will discharge into a proposed pond located along the <br />north property line of the site. <br />o Notes: Meets city cri teri a <br />City Criteria: Post - project storrnwater runoff rates must not exceed pre - project <br />runoff rates for the critical 1 -year, -year and 100-year events. <br />❑ Proposed: The storm surer system is designed to discharge at three <br />locations, the northeast at Rice Street, the northwest at Woodbridge Street, <br />and the south at County Load C. These discharges at those locations match the <br />pre - development discharge rates. In addition} roof ponding is proposed to <br />assist in the rate control. <br />Notes: : Meets city criteria <br />City Criteria: water quality treatment facilities shall he designed to meet the <br />following performance criteria: at least o % removal of total phosphorus and <br />85% removal of suspended solids on an average annual basis. This is to protect <br />the Grass Lake watershed Area. <br />• Proposed: A stormwater detention ponds is proposed along the north property <br />line to meet the performance criteria. <br />• Notes: Meets city criteria <br />lgnage (too9.o4_i3): <br />