Laserfiche WebLink
!'I <br />utility plan information, Drawing No. C-2 and -3, dated April 18, 2003. <br />Exhibit E Master fee conveyance, dedication, and easement plan illustrating all <br />proposed parks, ponds, trails, utility and other conveyances, dedications, <br />and easements to the CITY necessary for parks, ponding, trails, utility <br />services, access, and parking as shown on Preliminary Plat * dated <br />, 2003, and Final Plat dated June , 2003. <br />Exhibit F Landscape plan including materials list, sizes, and locations of all plant <br />materials, Drawing No. L 1 through L5, dated April 25, 2003. <br />Exhibit G Site lighting plan including specifications and lighting calculations for <br />cooperative parking lot, Drawing No. I dated June ', 2003. <br />Exhibit H Building floor plans of the Applewood Pointe of Arona cooperative <br />housing complex with dimensions of the facility, Drawings No. A 1.2, <br />A .oA, A .OE } A2. 1 o through A2.15 dated. April 25, 2003. <br />Exhibit I Building elevations of the cooperative housing complex with dimensions <br />and materials identified, Drawings No. AO. 1, A3.1 through A3.3, Roof <br />Elan A4.1 dated April 25, 2003. <br />. , <br />Exhibit J Anticipated site development schedule with estimated date of <br />construction start, construction completion, utility, curb, gutter and <br />landscape installation, and tentative occupancy date} dated May 28, 2003. <br />Exhibit K Building elevations and fled- plans of the Applevrood Pointe of Arona <br />ro house housing complexes with dimensions of the facility, Drawings <br />No. A2.1 and A3.1 dated April 25, 2003. <br />Exhibit L Rice Creek Watershed: Permit dated June , 2003 <br />Exhibit lei Developer construction access, deliverer and parking plan dated June <br />2003. <br />Exhibit N Signage plan for Cooperative Housing and rowhomes dated June <br />3 <br />