My WebLink
|
Help
|
About
|
Sign Out
Home
2003_0616_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2003
>
2003_0616_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2011 4:33:17 PM
Creation date
10/21/2011 4:22:25 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9.21 Site Fencing. The DEVELOPER is responsible for installing construction or security <br />fencing and for its removal prior to occupancy. The exact location of the security fence <br />and entrances must be approved by the Community Development Director or designee <br />9.12 Site Landscaping. Landscaping for the project shall include front boulevard trees along <br />Arona Street,Terrace Drive and Applewood Court consistent with the Roseville Master <br />Street Tree plan (a minimum of one in front of each dwelling unit in Block 1, Block 2 as <br />per City Code Section 110 +06E) and trees, shrubs and perennials throughout the site that <br />enhance the development and screen adjacent properties from view of vehicle headlights. <br />The landscape plan shall include screening (plants and/or berm) of the cooperative's <br />parking lot from public rights- of-way to a height of 30 inches above the parking lot curb <br />height. Block 1, Block 3, and outlot A must be irrigated. The final landscape plan <br />(Exhibit F) must be prepared by a state registered landscape architect per Section 1010 of <br />the City Code. <br />9.23 Landscape Letter of Credit. prior to the issuance of individual grading, excavation, <br />fbundation} and/or building permits, the DEVELOPER shall provide the CITY with a <br />landscape letter of credit, bond} or other security acceptable to the City, in an amount up <br />to 150% (as determined by the Con unity Development Director) of the full cost of all <br />landscaping, fencing, irrigation, and site restoration (Section 1010. l 4E) as per Exhibit E. <br />Thy Community Development Director or designee} following approval of the landscape <br />plan, shall determine the exact amount of each letter of credit or bond. After one (1) <br />growuing season} DEVELOPER may request a partial release of the letter of credit or <br />bond. The amount to be released shall be agreed upon between the DEVELOPER and the <br />CITY acting reasonably. <br />9.25 Site Access. Access to Bloch 3, Lot i site shall be provided from Applewood Court. A <br />public access and utility easement shall be provided across the Block 3, Lot I exterior <br />parking areas for city emergency and utility vehicles. <br />9.26 Construction Access. The DEVELOPER shall prepare a plan} which directs construction <br />vehicles* equipment, and materials entering or parking on or near the site to utilize roads <br />and easements and existing parking lots only as approved by the city public works <br />director. The DEVELOPED shall make even effort to direct all construction parking to <br />paved parking lots on site and/or off site and discourage street parking by construction <br />workers and equipment. The DEVELOPER shall make even effort to direct such traffic <br />to entry points other than Arona Street, unless Arona Street is the only access available to <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.