My WebLink
|
Help
|
About
|
Sign Out
Home
2003_0616_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2003
>
2003_0616_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2011 4:33:17 PM
Creation date
10/21/2011 4:22:25 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/ilia p���r <br />UPGRADED EXISTING PLAN -- PROPOSED WORK: <br />Remove and replace acoustical tile ceiling <br />IN New lighting appropriate for televised meetings <br />IN New carpet <br />CIT-11'r OF ROSEVILLE <br />COUNCIL CHAMBERS RENOVATION <br />DESCRIPTION OF ALTERNATIVES <br />New paint wall finishes <br />18 foot long ramp with handrails added for code - required accessibility to dais <br />(staff seating area remains inaccessible due to being one step lower) <br />Code-required handrails added for steps to dais <br />Existing acoustical panel background to remain <br />New dfop -down projection screen added behind seating area of dais (potential conflict with seating) <br />Existing dais millwork to remain with upgrades to remove fabric at face and replace with wood veneer <br />Existing standing presentation desk to remain with added accessible presentation area (seated position) <br />and upgrades to remove fabric at face and replace with wood veneer <br />ALTERNATE PLAN -- PROPOSED WORK: <br />Remove and replace acoustical tile ceiling <br />• New lighting appropriate for televised meetings <br />• New carpet <br />■ New paint/wall finishes <br />IIIIIIV Orientation of council Chambers revised to eliminate conflicts with windows and improve sitelines for <br />those seated at dads <br />Existing acoustical panels on south gall removed and walls painted. New curved acoustical panel <br />background behind Council seating area; panels added to existing wall behind staff seating at west <br />New signage behind seating area on acoustical wain <br />New drop -down projection screen added to left of dais seating (no conflicts with seating area) <br />New dads millwork to be installed with mood veneer faces and l asota stone top edge to match design of <br />other new millwork areas in city Hall. Millwork designed with full AIV capabilities. <br />Dais seating level with audience seating would eliminate steps and ramp (single step as an option with 7 <br />foot long ramp at screen area) <br />New seated presentation table to be added to meet accessibility requirements and creating a more direct <br />presentation location. Table also allows for televised work sessions and other meetings to take place. <br />"Table is designed with full A capabilities and can be split and moved if required. <br />Ankeny Kell Architects, P.A. <br />821 Raymond Avenue, Suite 400 St. Paul MN 55114 <br />651-645-6806 <br />
The URL can be used to link to this page
Your browser does not support the video tag.