Laserfiche WebLink
MRR —e3 -2003 1:3:4? RATWIK ROSZAK MALONEY <br />33.3 providing services to verify the accuracy of drawings <br />or other information furnished by the Owner. <br />� 3.4 Providing services required for or in connection with <br />the Owners selection, Procurement or mstaUation of furniture. <br />Turn ish in gs and related egtiipme nt. <br />3. d F5 providi ng services for to nant improve merit s. <br />3,3.6 Providing any other services not otherwise included in <br />this Agreement. <br />ARTICLE 4 <br />OWNER'S RESPONSIBILITIES <br />4.1 The Owner shall provide full information regarding <br />requirements for the Project, including a grogram which shall <br />set forth the Owner's objectives, schedule, constraints and <br />criteria, including space requirements and relationships, <br />flexibilim expandability, special equipment, systems, and site <br />requirements. <br />4.2 The Owner shall establish and update a n overall <br />budget for the Project based on consultation with the <br />Construction Manager wid Architect, which shall include the <br />Construction Costs the Owner's other costs and reasonable <br />contingencies related to all of these costs, <br />4.3 If requested by the Construction Manager. the Owner <br />shall furnish evidence. that financial arrangements have been <br />m ad to fu 1 fill the Owne is obligations under this Agree, rat, <br />4.4 The Owner shall designate a representative authorized <br />to aci on the Owners behalf with respect to the Protect. The <br />owner, or such authorized representative, shall render <br />decisions in a timely manner pertatining to documents <br />submitted by the Construction Manager in order to avoid <br />Unreasonable delay in the orderly and sequential progress of the <br />Construction Manager's services. <br />4,5 The Owner shall retain an architect whose services, <br />du ties and responsibilities are described in the edition of AIA <br />Document B141 /Cma, Standard Form of Agreement between <br />Owner and Architect, Construction Manager- Adviser Editiolt, <br />current as of the date of this Agreement. The Terms and <br />Conditions of the A reement Between the Owner and <br />Architect shall be f urnis led to the Construction Manager and <br />� -` -the <br />Nianagers -wit <br />UjIfem M 14 31611- W. The Construction Manager shall not be <br />responsible for actions taken by the Architect. <br />4.6 The Owner shall furnish structural: mechanical, <br />chemical, air and water pollution tests, tests for hazardous <br />materials and other laboratory and env-ironnien sal tests, <br />inspections and reports required by law or the Contract <br />Documents, <br />4.7 The Owner shall furnish all legaii, accounting and <br />insurance counseling services as may be necessary at any time <br />for the Project, including auditing services the Owner may 5.1.3 Construction Cost does not include the compensation <br />require to ver4 the Contractors' Applications for Payment or of the Architect and Architect's consultants, costs of the land, <br />to ascertain .hoar or for what purposes the Contractors have rights-of-way, Financing or other costs which are the <br />u <br />RI Ar -14STITUTE OF -ARCHITECTS, 1735 NEWYORK AVENUE, N.W., WASHINGTON, - =-- A A DOCUMENT a <br />- OWNER- CONSTRKTION MANAW AGREEMENT - 1992 EDITION , A[AS - WARN1NG: Unlicensed photocopying violates U.S. copyright laws and <br />will subject The viol aTor to legal prosecution. This document was electronically produced with permission of the A!A and can be reproduced to <br />accordance with your license without violation until the date of expiration as noted below. expiration as rioted below. user Document: 4002(l }- <br />4 5(680 1) -a i a -- ,13012003. AtA License Number 100M63, which expires an 21212003. <br />6123390038 P-10 <br />used the money paid by or on behalf of the Owner. Ugth irtg- <br />in h v t an ` <br />on Lhq..Owner i legal colinAgil gE to indUM <br />Constwcfinn Manacter against ' wrongful- <br />4.8 The Owner shall furnish the Construction Manager <br />with a sufficient quantity of Construction Documents. <br />4.9 The services, information and reports required by <br />Paragraphs 4.5 through 4.8 shall be furnished at the Owner's <br />expense, and the Construction Manager shall he entitled to rely <br />upon the accuracy and completeness thereof. <br />4.10 Prompt written notice Shall give n by the Owner to <br />the Construction Manager and Architect if the Owner becomes <br />awam of any fault or defect in the Project or nonconfannence <br />with the Contract Documents. The Ownei's fallure to gLye <br />ngj6ge . h wpypf __ �haL.Ogj rgligvg the Qgnstruabpn _ <br />Manggp,r Qf its obliga igns n r thi rep e <br />4,11 The Owner reserves the right to perform construction <br />and operatiors related to the Project with the Owner's own <br />forces, and to award contracts in connection with the Project <br />which are not part of the Construction Manager's <br />re5 pohsibilitie s under this Agreement. The ot�struction <br />Manager shall notify the Owner if arty such independent action <br />will interfere with the Construction Manager `s ability to <br />perform the Construction Manager's resporuibi ities under this <br />Agreement. when performing cons"rtion or operations <br />related to the Project, the Owner agrees to be subject to the <br />saute obligations and to have the same rights as the <br />Contractors. <br />4.12 Information or services under the Owner's cotitrol <br />shall be furnished by the Owner with reasonable promptness to <br />avoid delay in the orderly progress of the Construction <br />Maxiagc is services and the progress of the Work. <br />ARTICLE 5 <br />CONSTRUCTION COST <br />r *JIN i O <br />5.1.1 The Construction Cost shall be the total cost or <br />estimated cost to the owner of all elements of the Projecl <br />designed or specified by the Architects <br />51.2 The Construction Cost shall include the cast at <br />current market rates of labor and materials furnished by the <br />OwIler and equipment designed, specified, selected or specially <br />provided for by the Architect, plus a reasonable allowance for <br />the Contractors' overhead and profit. In addition, a reasonable <br />allowance for contingencies shall be included for market <br />conditions at the time of bidding and for changes in the Work <br />during construction. Except as provided in Subparagraph 5.1.3, <br />Construction Cost shall also include the compensation of the <br />Construction Manager and Construction Mmiager's <br />consultants. <br />Electronic Format H IXM a -1 992 <br />6 <br />