Laserfiche WebLink
MAR -03 -72003 13: Q RATWIK ROSZAK MALONEY <br />it A <br />Conditions of the Contract for Construction, Construction <br />Manager - Adviser Edition, current as of the date of this <br />Agreement- The Owner and Coinstiuction Manager each shall <br />require similar waivers from their Contractors, Architect, <br />- tsultants, agents,, and persons or entities awarded separate <br />itracts administered under the owner's own forces. <br />10.5 The Owner and ConAruction Manager. tespectiveiy, <br />bind the rnselves, their partners, successors. assigns and le al <br />representatives to the other party to this Agreement and to t e <br />partners, successors, assigns and legal, representatives of such <br />other part} with respect to all covenants of this Agreement. <br />Neither Owner nor Construction Manager shall assign this <br />Agreement without the written consent of the other- <br />10.6 This Agreement represents the entire and integrated <br />agreement bekt -jeen the Owner and Construction Manager and <br />supersedes all prior negatiations} re prewntations or <br />agreements, either written or oral. This Agreeme rtt may be <br />amended only by written itutrurnent signed by both Owner and <br />Construction Manager. <br />10.7 Clothing contained in this Agreement shall create a <br />contractual relationship with or a cause of action in favor of a <br />third party against either the Owner or Construction Manager. <br />10.8 Unless oth€ revise provided in this Agreement, the <br />Construction Manager and the Construction Manager's <br />consultants shall have no responsibility for the discovery, <br />presence, handling, removal or disposal of or exposure of <br />persons to hazardous materials in any form at the Project site, <br />including but not limited to asbestos, asbestos products, <br />polychlortnated biphenyl (11CB) or other toxic substances. <br />ARTICLE 1 <br />INSURANCE <br />11.1 CONSTRUCTION MANAGER'S LIABILITY <br />INSURANCE <br />11.1.1 The Construction lYf anager shall purchase from and <br />maintain in a coin p -any or companies lawfully authorized to do <br />business in the jurisdiction in which the Project is localed such <br />insurance as Will protect the Construction Manager from <br />claims set forth below which may arise out of or result from the <br />Construction Manager's operation under this Agreement and <br />for which the Construction Manager may be legally liable. <br />claims under workers compensation, disability benefit <br />and other similar employee benefit acts which are <br />applicable to the operations to be perforined; <br />.2 claims for damages because of bodily injury, <br />occupational sickness or disease, or death of the <br />Construction Manager's emplayees; <br />3 claims for damages because of bodily in ]-ury, sickness <br />or disease, or death of any person other than the <br />Construction Managers employees; <br />.4 claims For damages insured by usual personal injury <br />liability coverage which are sustained (r) by a person <br />as a result of an offense directly or indirectly related to <br />61 233 90036 P.13 <br />ernployrnent of such person by the Contraction <br />Manager, or (2) by another person; <br />.5 claims for damages, other than to the Mork itself, <br />because of injury to or destruction of tangible <br />property, including loss of use resulting ther+efrorn; <br />.6 claims for damages because of bodfly injury, death of a <br />person or property damage arising out of ownership, <br />maintenance or use a f a motor vehicle. <br />11.1.2 The insurance required by Subparagraph u.1.1 shall be <br />written for not less than limits of liability speci Fed in Anicle 14 <br />or required by law, whichever coverage is greater. Coverages, <br />whether written an an occurrence or claims -rude basis, shall <br />be maintained without interruption korn date of <br />cornmencernent of operations under this Agreement until date <br />of final payment and termination of any coverage required to <br />be maintained after final payment. <br />ARTICLE 12 <br />PAYMENTS To THE CONSTRUCTION MANAGER <br />12 *1 DIRECT PERSONNEL EXPENSE <br />12,1,1 Direct personnel Expense is defined as the direct <br />salaries of the Construction Manager's personnel engaged on <br />the Project and the portion of the cost of their mandatory and <br />customary contributions and benefits related thereto, such as <br />employment taxes and other statutory employee benefits, <br />insurance, sick leave, holidays, vacations} pensions -arid similar <br />contributions and benefits. <br />12.2 REIMBURSABLE EXPENSES <br />12.2,1 Reimbursable Expense are in addition to <br />compensation for Basic and Additional Services and include <br />expenses incurred by the Construction Manager and <br />Construction Manager's employees and consultants in the <br />interest of the Project, as identified in the Following Clauses. <br />12.2.1.1 Expense of transportation in contlection with the <br />Project, expenses in connection with authorized out-of-town <br />travel; long - distance communications; and fees paid for <br />securing approval of authorities ]paving jurisdiction over the <br />Project. <br />12 -2.1.2 Expense of reproductions. postage, express de4verxes, <br />electronic facsimile transmissions and handling of Drawings, <br />Specific ations and other documents. <br />12.2.1.3 If authorized in advance by the Owner, expense of <br />overti me work requiring higher than regular rates. <br />12. -1.4 Expense of additional insurance coverage or limits <br />requested by the Owner in excess of that normally carried by <br />the Construction Manager. <br />12.3 PAYMENTS ON ACCOU NT OF BASIC <br />SERVICES <br />12.3.1 An initial payment as set forth in Paragraph 13.1 is the <br />9 <br />rmnirnum payment under this agreement. <br />A' R <br />0 1992 t R AV ~ VAN RI INSTITUTE ARC , V ., WA IN N, _ - . A(A 5ocumEMT0T/U Fa <br />�)WN ER•CONSTRU CTION MANAGER AGREEMENT - 1992 EDITION - MAO - WARNING: Unlicensed licensed photocopying violates U.S— e6pyeighf laws and <br />.ill subject the violator to legal prosecurion. This document was electronically produced with permission of the AIA and can he reproduced in <br />accordance with your license wirhour v,olar;on wiril the dare of expiration as noted below_ expiration as noted below. User Document: 4042(1)- <br />45$801),aia 1!3012003, AIA License Number 1001863, which expires on 29212003. <br />Electror3ic Format 88011CMa -1992 <br />