My WebLink
|
Help
|
About
|
Sign Out
Home
2003_0331_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2003
>
2003_0331_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2011 10:21:36 AM
Creation date
10/24/2011 9:44:34 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11AR -0 3 -2003 13:48 RATW I K ROSZAK MALONEY <br />12.3.2 Subsequent ,payments for Basic Services shall be made <br />monthly ands where applicable, shall be in proportion to <br />somices performed within each phase of service, on the basis set <br />forth in Subparagraph 13.2 -1. <br />12.3.3 If and to the extent that the time initially established <br />in Subparagraph 13.5.1 of this Agreement is exceeded or <br />extended Through ria fault of the Construction Manager, <br />compensation for any services rendered du ring the additional <br />period of time shall be computed in the rnanner set forth in <br />Subparagraph 13.3.1. <br />1 2.3.4 When compensation is based on a percentage of <br />Construction Cost and any portions of the Iaroied are deleted <br />or otherwise not constructed} compensation For those portions <br />of the Project shall be payable to the extent services are <br />performed on those portions, in accordance with Subparagraph <br />iyZ.1, based on (i) the lowest bona. Fide bids of negotiated <br />proposals, of (2) if rio such bids or proposals are received, the <br />latest approved estimate of such portions of the Project. <br />12,4 PAYMENTS ON ACCOUNT OF ADDITIONAL <br />SERVICES AND REIMBURSABLE <br />612339003E P.14 <br />EXPENSES <br />12.4.1 payrnetlts Qn account of the Construction Manager's <br />Additional Sel cci and for Reimbursable aperises shad be <br />made monthly upon presentation of the C;anstructioit <br />Manager's statement of services rendered or expenses incurred. <br />12.5 PAYMENTS WITHHELD <br />12.5.1 No deductions shat! be ,made from the Constntction <br />Managers compensation on account of penalty, Hquidated <br />damages or other sums withheld firont payments to <br />ontractors, or on account of the cost of changes in Work <br />other than those for which the Construction Manager has been <br />found to be liable. <br />11.6 CONSTRUCTION MANAGER'S <br />ACCOUNTING RECORD <br />12,63 Records of Reimbursable Expenses and expenses <br />pertaining to Additional Services and services performed on the <br />basis of a multiple of Direct Personnel Expense shall be <br />available to the Owner or the Owner's authorized <br />representative at mutually convenient tunes. <br />ARTICLE 13 <br />BASIS Of COMPENSATION <br />The Owner shall compensate the Construction Manager as Follows: <br />13,1 AN INITIAL PAYMENT of DaYlars (s shall, be inade upon execution a F this Agreerneni and cred iced to the <br />owner I s ace ou rrt at final payment. <br />13.2 BASIC COMPENSATION <br />13.2.1 FOR BASK SERVICES, as described in AetlCle 2, and any other services included in Article 14 as part of Basic Services, Basic <br />Compensation shall be computed as follows; <br />For Pre- Construction Phase Services-- <br />(In sen &isis ofcaipptwsa on. includiq sdp tf1 .itcdsrtfv F rnuJdplrs or pc- me -ritogm ) <br />Qom t f r th i th n t tin h r-�►i <br />For Construction Phase Services: <br />(Mien Ims1s ofco mpensidon, including sLipWolcd sum, multip lct orp -crix1ilug,-x.) <br />4 25001 000 <br />13.3 COMPENSATION FEAR ADDITIONAL SERVICE <br />13, 3.1 FOR ADDITIONAL SERVI ES OF THE CO STRUCTION MANAGER# as desc ribed i A.rticle 3, and any other service$ <br />included in Article 14 as Additional Services, compensation shall be computed as follows: <br />(la snr( Lu- srs of warp ens: iron, indt &i?g nj res and1br rn uldr lcs ufl i=1 Per5onnel Exp cnse far Principals and an ploy ear and idm ii,(y PritP4aIs sn d dissrfy emp 4crs, <br />hrralaLr d Men ly spze icscF ccs (o which par imlarmclhos &fcwnp axr►tror� app} , rfrre r�. <br />To Ir # prior t000clrrn, <br />13.4 REIMBURSABLE EXPENSES <br />13,4.1 FOR REI iBURSABLE E PE SEE, as described in Paragraph �.2, and any other items included itr article 14 as Reim'.bursable <br />Expenses, a multiple of ( !--Q ) times the expenses incur red by Lhe Construction Manager and the Construct ion Manager's <br />employees and consultants its the interest of thie Project.,_ ua rintertdenl = ill t hrpe ThQusand and No/100 Doltar_s_ <br />13.5 ADDITIONAL PROVISIONS <br />0 1992 } <br />.. , N. .. H kN N, - . AIA U h N a <br />- OWNER -CONST RIJC ION MANAGER AGREEMENT - 1992 EDI Tf ON - A IA(D - WARNING: Unlicensed photocopying violates U.S. copyright lags and <br />Iry i l l sublecr the VialaTOr ra legal prosectrr ion , This document was electronically produced with permission of the AIA and can be reproduced in <br />accordance with your 1 icense without violation unt it the date of exp i rat ion as ,toted be love. expirat tor, as noted below. tlser Document: 4002(l)- <br />aclo$dln.aia -, 1!30{2003, AIA License Nurnber 1001863. which expir6s on 21212003. <br />E 1 ectron is Fa rmat B8011CMa -11992 <br />au <br />
The URL can be used to link to this page
Your browser does not support the video tag.