My WebLink
|
Help
|
About
|
Sign Out
Home
2003_0310_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2003
>
2003_0310_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2011 10:52:16 AM
Creation date
10/24/2011 10:43:31 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
reviewed by the City's consultant. A copy of his response is attached. <br />7.7 Site lighting could be an issue for the adjacent property owners and neighborhood. The <br />onnnunity Development Department has not reviewed the site lighting plan. It will need to <br />meet the minimum standard of 0.5 foot candles at the property line. All lighting fixtures must <br />be cut-off/downcast type. <br />7.8 City Staff has reviewed the placement of mechanical equipment. Given the proposed roof peak <br />types it is assumed that heating, cooling, and ventilating equipment, specifically air <br />conditioning units need to be affixed as wall units to the building facade, placed on the ground, <br />or placed within roof cavities. Those units that are ground units should be centrally placed in <br />the courtyard and 100% screened from view. Should an emergency generator be contemplated <br />for senior housing/retail building, the plans must indicate the proposed location and the <br />generator must meet all applicable State decibel levels. <br />7.9 Because of the sensitivity of residential areas and adjacent property owners, construction hours <br />must be limited to 7 a.m. to 10 p.m. weekdays and 9 a.m. to 9 p.m. weekends and holidays as <br />stipulated in the Roseville City Code. <br />7.10 The City Staff will work with Presbyterian domes and their contractor to take down and bury <br />the electrical and utility service lines that surround the site. Hamline Avenue has a higher <br />voltage line that still may be buried along the project frontage. <br />7.11 The City has adequate sanitary sewer, storm water, and waternnain in place to support the <br />development project. The Public works Department and the Rice Creep watershed, prior to <br />Final Development Plan consideration, must review and approve these plans. The site plan <br />indicates (estimated) an impervious surface coverage of 140,000 to 150,000 square feet or 60 <br />70% and because of this, a surface water storage pond is necessary, and is shown in the <br />courtyard as an amenity. <br />7.12 Combining these two developments through purposeful design, the development meets staff <br />guidelines suggested in the Neighborhood Enhancement report utilized by the Community <br />Development Department. The applicants may request a Community Enhancement grant (from <br />funds provided to the City from a Metropolitan Council grant) to improve the public boulevard <br />street Fees, vegetation, and sidewalk amenities. <br />7.13 The proposed redevelopment project will be staged with the east portion of the shopping center <br />being razed first, allowing tenants to remain in the west portion while Sunmerhouse is under <br />construction. Upon completion of Summerhouse, tenants will vacate the wrest portion of the <br />shopping center and the rernaining structure will be razed and completion of site improvements <br />will occur. <br />8.0 RECOMMENDED CONDITIONS: <br />8.1 The design of Summerhouse should be compatible with the general context and human scale of <br />PF3421 — INCA Concept Plan - 031003 Page 8 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.