My WebLink
|
Help
|
About
|
Sign Out
Home
2003_0113_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2003
>
2003_0113_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2011 1:01:11 PM
Creation date
10/24/2011 12:53:12 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I a I d- k I <br />k o Oki 0 0 9 1111 1 <br />DATE: I /13,/03 <br />ITEM NO.: VIII. A. <br />Department Appir�ov�al: Manager Reviewed: <br />00-1% Agenda, Section: <br />X <br />Report s/Recommendat <br />ions <br />A <br />Item Description: Receive Feasibility Report/' Schedule Public Improvement Hearings for <br />2003 Pavement Management Program (PiMP) <br />Background,*' On October 14, 2002., the City Council sel�ect�ed neighborhoods for the 210iO3 PMP and <br />orid,ered, the preparation of a feasibility report fo�r these neighbio,rh,00d,s. The neighborhoods selected <br />are as follows: <br />Neighborhood 61 1 1 n <br />I W'. V'ctorl'a Servi"ce D "ve (Sandhu,rsit Avenue to dead, end) <br />Neighborhood 68 Pineview Court (Dale Court to cul-de-saa� <br />1, <br />An informational meeting, will be held on january, 9 with both neighborhoods. At this meeti , ng, staff <br />will review the ov'e'r'all PMP, the City'si assessment policy, and an, overview of typical s�treet <br />reconstruction. Residents will provide input to, staff regarding specific neighborhood concerns. <br />In accordance with, City Council, direction a feas�ibil" A I <br />ity report nas been Prepared, that details the <br />propolseid, design,, neighborhood, impact, and, estimated cost oif'th,e p Iii lse�d 2100�3 PMP1. Copies of th* <br />compile�ted feasibility reports' are enclosed. The next sitep in the process 'is for the council to accept <br />the feasibility report and to schedule public hearings., <br />-its are being considered, as part <br />Policy objecitives.e The various recommen,ded, streiet improvement projec <br />of the City's 200�3 PMP. The pirojec,tsi are con,sistient with, the policies ofiginally established for the PMP <br />su,mmatized as foill,ows: <br />Rolads will be reconstructed based upon, pavernent condition and reconstruction will be done by <br />neighborhoods. <br />I Petitions for stTeet improvements will be considered alongi with projects evaluated based on <br />pavement evaluation scolre., <br />4. Project costs will be assessed consistent with city, assessment poilicl <br />5. Public, hearings will be held consistent with state, statutei to consider all PN9 projects,. <br />Financial implikations: These projects have major financial implications for the city including the <br />following: <br />
The URL can be used to link to this page
Your browser does not support the video tag.