My WebLink
|
Help
|
About
|
Sign Out
Home
1997_1215_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1997
>
1997_1215_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2011 1:05:29 PM
Creation date
10/26/2011 1:00:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In addition to the abolve fees, all transformers for silgns and outline lighting shall <br />i <br />e e a i .70 for <br />b computd at�, thel first 500 VA or frdon th�ereof per, unit, Plus <br />each additionaI 100 VA or fraction thereof <br />Power supply units a,ccord�ing, to itern (B) of'feie sichedule. A like fee will <br />bie required, on power, supply units at each engag�eimen�t during the <br />season, except, that a fee, of $,25.,O�O pier hiour wili be charged for additional <br />time spent by the Inspector, if t,h�e power supply Is not ready for inspection <br />as required by law. <br />1 Aides,, Devices, or Concessilions,: Shal�l be, iin�speicted at, their first <br />ippearance of' the seasion and the inspection fee shal�l be $1210�.O�O per unit. <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.