Laserfiche WebLink
In addition to the abolve fees, all transformers for silgns and outline lighting shall <br />i <br />e e a i .70 for <br />b computd at�, thel first 500 VA or frdon th�ereof per, unit, Plus <br />each additionaI 100 VA or fraction thereof <br />Power supply units a,ccord�ing, to itern (B) of'feie sichedule. A like fee will <br />bie required, on power, supply units at each engag�eimen�t during the <br />season, except, that a fee, of $,25.,O�O pier hiour wili be charged for additional <br />time spent by the Inspector, if t,h�e power supply Is not ready for inspection <br />as required by law. <br />1 Aides,, Devices, or Concessilions,: Shal�l be, iin�speicted at, their first <br />ippearance of' the seasion and the inspection fee shal�l be $1210�.O�O per unit. <br />6 <br />