My WebLink
|
Help
|
About
|
Sign Out
Home
1992_0928_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1992
>
1992_0928_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2011 11:24:01 AM
Creation date
10/28/2011 11:10:44 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0002- <br />lc me <br />d oun-L <br />Or <br />.I <br />+ . Wne <br />beQUnQ L d5 <br />5uv <br />u <br />gay <br />r rdr..-c�divn+ <br />Excavating <br />in, <br />the <br />anount. <br />of $297,8017,,20. <br />For <br />Alternate <br />1, <br />Park <br />nstr <br />ucti <br />n,l <br />hid was <br />$18,675.75 <br />and Frattal <br />n ' s <br />bid <br />was <br />$15,294.00 <br />Without <br />considering <br />any <br />of the <br />addIt L " nal bid <br />alternates <br />or <br />combinations <br />of <br />alternates <br />the <br />apparent low <br />bidder is Park , <br />Construction <br />for the base <br />id <br />plus <br />Alternate <br />1,. <br />The amount, <br />of the hid submitted <br />by <br />Park <br />Construction <br />is <br />$ <br />Fra,ttal ne is the <br />second <br />low <br />hidden in the <br />amount <br />of <br />l ,101. <br />01. <br />Park's <br />low bid is approximately <br />$or <br />11.51 <br />below <br />the <br />en <br />ineer's <br />estimate. <br />Irli,n,anCial <br />implications. <br />The bads <br />submitted are <br />well <br />within <br />the <br />anticipated, <br />budget, for <br />thi, s element <br />of the project. <br />we <br />budgeted <br />$ <br />to <br />$ <br />for <br />required <br />site grading <br />and <br />utility <br />work. <br />Staff <br />recommend <br />at <br />n** <br />n anal <br />n the bids, <br />we considered <br />several <br />factors. <br />These <br />are summarized <br />in the recommendation <br />from <br />the <br />rojec <br />consultant, <br />ary <br />Ehriet <br />of BRW. <br />In <br />analyzing, <br />the <br />bids, <br />it should <br />be noted that <br />the <br />two <br />low <br />bidders, Park <br />r..1onstruction. <br />and <br />Frattal <br />ne Excavating, <br />submitted <br />bids <br />with <br />significantl <br />:1iffe're'nt. <br />a, si <br />sumpt,31Mons.1 <br />Frattal <br />ne' s base hid <br />had <br />a. <br />higher <br />unit price <br />for <br />excavation <br />and <br />removal <br />of <br />material.1 However, <br />if <br />material <br />was lift <br />
The URL can be used to link to this page
Your browser does not support the video tag.