Laserfiche WebLink
L�� <br />Construction,"s bid alternate, was an i' i' - amount of <br />excavation mater, I'al requeisted to be, left, _ I <br />2,iOOO cubic 'yaridsil,, then because of the signeficant deduct, Frattalone <br />'--ecame thie, low bidder and Park the second low bidder. <br />!' <br />The total net bids, when, the various alternate, combinations have been <br />included d outlined r <br />Frattalone <br />P i <br />go M--, <br />Adoption of resolution awarding, bids to Fratitialoine Excavation for city <br />1'rojecti i # y1 ! i site utilities Rose <br />'.%inniesiota, Ova,l in a, niet, amount of $285,878s7O including acceptance of <br />the base i A <br />excavation amounti of 10,000 cubic yards to be left on site. <br />