Laserfiche WebLink
0 1 j <br />To. Steven Sarkozy, CaLtyi Managell <br />From.* Steven D,. Gatlin, Public Works, Director <br />Re: MAINTENANCE OF OAKCRIEST POND <br />Date: July 14,, 1992 <br />044, <br />On June 24 r 19,92 r i sent 'you a memo regard ing the current status <br />of the Oakcrest Pond,. You asked, that I pursue th is matter in <br />9 <br />more det,a iI and briefly summarize current options available to <br />the cl ty <br />9 <br />Existing storm sewer, lanes can be rerouted,, if necessary, to <br />Ir <br />increase the marketability of the lots, <br />3. The lots are salable with storm, gewer pipes in place wiTn <br />a it @1 0 <br />c-e rmain. var,iances and, building lizitation <br />it 'i's assumed as a, mioni'mum that all -,costs for filling the swale <br />and rerouting the storm sewer lines, can be offset by the proceeds <br />f rom the sale, of these lots,, However,, further investigation of <br />