Laserfiche WebLink
Page, 2" <br />Steven Sarkozy <br />July 1,4,r 1992 <br />this would bile necessary including detailed storm sewer analysis <br />tio ensure adequate downstream caplacity and review by a qualifief <br />ffil if for the lots. We <br />appraiser to detem,ine potential sale prices <br />estimate the costs for this, analysi"S w,ould be, as follows: <br />1,, Storm, sewer, review, design of plonding/pipe capacity $5, 001hTj <br />2 Appria isal s for lot, sale $1 IF 000 <br />At this time,, two alternate courses of action appear possible. <br />These include*,, <br />Pavement oif tih,eli concrete swale at a cbst of $12,000 $14,000 <br />aId, continued maintenance of the poind on a regular basis <br />Pursue further the alternate outlined for sale of the <br />property and rerouting the storm siewer,e <br />Gi <br />Please advise as to how, you wish, for me t,ol proceed with this <br />S <br />item. Currentlyll, we plan, to clean the,, swale as soon as, 'it is dry <br />enough to allow access for equipmentlD <br />