Laserfiche WebLink
W. Steve, Ga,tlm* <br />March, 23, 1,992 <br />Page Two <br />* Identify possible concerns about how, composting is, currently done <br />* Analyze program costs <br />OS,M wiffl use data provided by the, City, to determi,ne. present total, cost and per-ton, cost <br />e i"dei a baseline for <br />of Roseviffle's la,f composti"ng program , This informati" o n w,il,l provi <br />projectffig program, costs ff 1"t proves necessary to upgrade the program,. <br />10ma" <br />0' 0 <br />If the City declides to undertake finprovements to the compostmia site and operati I ons, Phase H <br />RWIV <br />Ai <br />work will include the following: <br />0 site Design site dra,m'a,ge system <br />