Laserfiche WebLink
4h N AN . <br />mr. bteve <br />March 23., 1992 <br />Page Tbree <br />96 0 <br />ISM Vaill design a runoff control system to manage runoff water triom the composting sit,_-v <br />tr 1 <br />I:rd mmimtze the chances for harming the adjacent, wetlandsi,, The runoff coin oil plan w 111 <br />OF Ii 41i IW <br />Clinclude a, survey, of the Site, a grading plan, and a design for a retention, pondi or runoff <br />rIvIntrol structure, <br />9 Develop Operating, Plan <br />* Evaluate other alternatives <br />4 <br />If directed by the City, OSM wi,l,l assist in evaluating alternative si,ties or program options, <br />9 Ip 5 & 9 lk 9 a <br />ng ring m,unicipa ies in managing yiar <br />such as 3r with nel*gbbo lit id, waste. <br />Ii l,e,ti and before the <br />The estimated fee for, Phase 11 will, be developed after Phase I is comp ed <br />City decides whether or not to continue with the second phase, <br />We appreciate this opportunity, to offerl our enviromental planning and, engineering services <br />to the City of Roseville., If you have any, questions aboiut the propoised, sc,opei of'work or <br />estimated fee, do not hesitate to call. We look forward to workbag with you on this projecto <br />T 0641 <br />� Al <br />JeffTey Turner <br />Project Manager <br />