Laserfiche WebLink
A&, Steve., Gatlin <br />Mwch 23., 1992 <br />Page, Tbree <br />OSM Vn*lI desiop a, runoff control system to, manage runoff water from the composting site <br />and minim=*' the chances for harming the adjacent wetlands. 7be runoff control plan will <br />0, a <br />Include a smvey of the site., a d' plan, and a design for a, retention pnd or runoff <br />W 9M Ing. <br />:!I�Am-ttpl ovivurewi. <br />I <br />D�evelop 011!� ml� �1� <br />lei Evaluate other alternatives <br />0 <br />Ifidirected. by the City, OSM will assist in evaluating alternative Sites or program options, <br />a Op & 6 V 1 6 <br />such as joining with neighboning municipalities in, managing yard waste, <br />The estimated fee for Phase II will be developed after Phase I i's completed and before thl-x <br />41 9 <br />City aecides whether or not to continue with the second, phase& <br />V 0 a 5 <br />e apprecliate this Opportunity to, offer our enviTOnMental planning and engineerm"g services <br />to the City, of Roseville. If you have any questions about the proposed scope of work or <br />0 0 ^14 <br />estimated fee, do not hesitate to call. We look forward to worldng with you on this projeci <br />Ri Sim <br />