Laserfiche WebLink
REQUEST FOR COUNCIL ACTION DATE: 4-13-92 <br />ITEM NO*: <br />bip--artm,e,nt, Approval: Manager Reviiew-e-d: Agenda Section: <br />Reports and <br />ii <br />Hearings <br />4 <br />Item Description. Auit,h,orizati I on to enter into a development <br />agrelement with NCR., <br />q 9 1 1 <br />11 The, Roseville NCR Manufacturing Division is competing with <br />Ohio., South Carolina, Indiana, and Little Rock with respect <br />I in 111 0 <br />to securing existing manufacturing capacity that will move <br />do 1. <br />into, one of these. facilitliese <br />2a In order to obtain this manufacturing component, NCR <br />Roseville is attempting to secure, "surface mount technology" <br />wh ich 6i would substantially increase net employment i n the <br />41 <br />existing facility by over 240 jobs based on current <br />III <br />projections over 10 years.. <br />Alternatives: <br />0 <br />Roseville could let NCR "'take its chances" in competing <br />,against the other facilities. if' the Roseville NCR group is <br />not successful,, the jobs and proposed increase in payroll <br />would, not occur I this new technology 'i's not obtained, <br />,Also, tihell potential exists for a significan't reduction in <br />existing manufacturing employeies.1 <br />10 0 <br />10 it is recommended that this piroij ect be approved based on the <br />in <br />follow, <br />• W <br />A's The number of' employees at the NCR facility would <br />increase substantially reaching a high level of 300 in <br />1995,o W I ithout this technology, the employment would be <br />substantially reduced at the Roseville facility over' <br />