My WebLink
|
Help
|
About
|
Sign Out
Home
1991_1216_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1991
>
1991_1216_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2011 11:30:52 AM
Creation date
11/2/2011 11:18:08 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Summary of' Costs a Ph,a,s�e I: <br />The following two tables, summarize the costs for Phase I work at each facility owned by the School <br />T7 I <br />Nstrict of Roseville. <br />Ned it , <br />These cost estimates were de, Ned from plans that appear later in 1,Ws book and 'Involve 3 different levels <br />of construction that will of r in each facility. The tat Level is, described as Maintenance. The 2nd <br />Level, as Alterations and the 3rd Level as Additions. The description of these are more fully covered <br />elsewhere "in this report. These are shown in the List of Coats, <br />The costs are totalled for three, different options for, Phase 1. A descfiption of' each Option follows: <br />option all gra,de structure in existing schools will be left as is and the school will receive mostly <br />maIntenance and, some remodeling. It presumes that ■o bl,e structures would be removed at each <br />-S&'0016 <br />Option BY, <br />Option. C descfibeis the high school, at the Lake Owassillo sifte. That high school i's presumed to have the <br />same faci"likies that, now exist in the current high, school. All other distfict facilities would receive the <br />same construction as in Option, <br />vp� <br />. <br />so <br />go <br />to <br />29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.