My WebLink
|
Help
|
About
|
Sign Out
Home
1991_0311_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1991
>
1991_0311_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2011 8:54:22 AM
Creation date
11/3/2011 8:53:45 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Approval: <br />REQUEST FOR COUNCIL ACTION DATE: 3/11/91 <br />Manager Reviewed: <br />ITEM NO.: F-.1, <br />Agenda Section: <br />Reports and Recommendations <br />Item Description: Receipt of feasibility study and ordering of <br />improvement for city project P- 91- 13- -Zeece <br />subdivision cul -de -sac south of County Road B. <br />Background: The City Council at its January 28, 1991, meeting <br />received a petition from Steve and Trotty Zeece for the construction of <br />a cul -de -sac to serve the lots they are currently platting and ordered <br />staff to prepare a feasibility report. The engineering department has <br />completed preliminary engineering plans and a feasibility report <br />detailing the proposed project. <br />Policy objective: Based on Minnesota statute, projects petitioned for <br />by 100% of the benefiting properties may be ordered by the city council <br />without a public hearing. <br />Financial implication: It is proposed that general obligation <br />improvement bonds be sold to finance this project and 100% of the <br />project cost be assessed to the new residential lots. It is anticipated <br />that this project along with other 1991 construction projects will not <br />exhaust the city's bonding capacity. <br />Schedule: If approved, this project will be constructed as part of 1991 <br />Contract A along with other 1991 PMP projects. It is anticipated that <br />construction will commence approximately May 15 and be completed by <br />approximately July 15, 1991. <br />Staff recommendation: Council receive the.feasibility report and <br />order the construction of the proposed cul -de -sac in order to dovetail <br />the construction of this cul -de -sac with other 1991 PMP projects. It <br />recommended that the council utilize the flexibility of the 100% <br />petition allowed by Minnesota state statute and order this project <br />without a public hearing. <br />COUNCIL ACTION: <br />Adoption of a resolution receiving the feasibility study and ordering <br />the improvement for city project P- SS- W- 91 -13- -Zeece Addition cul -de- <br />sac. <br />
The URL can be used to link to this page
Your browser does not support the video tag.