Laserfiche WebLink
'I <br />Barton- Aschman Associates, Inc. <br />March 8�,, 1,9�90 <br />Page 2" <br />10 Dat,a, Collection and Any a1 y'sis <br />I I <br />210 Traffic, AsiOgnment and Distribution <br />3m County Road C/1-351W' Interchange Capacity AnIa,l is <br />Bia,rton-,Asch,m�a,n w"l l conduct an existing traffic ca,paci'ltiy analysis for <br />the County Road C 1 i nterchange for t,he P.M. peak hour on an, <br />aveirlage weekday ., In addition, traffic v,oIlume projections will be <br />prepared for t,hel year 2000 for the Coun ty Road C'/I-35W interchange and <br />a t, o lacity, analysis, will be con�du,cted utilizing th�is year 2000 <br />traffic projection.1 <br />I <br />Estimated O00 <br />4401 Revi�ew of' Metropolitan CoIunci'l Year 2010 Travel Forecast <br />The Metropolitan Council year, 2010 travel forecast will be reviewed <br />compareld to, the traffic vollume projelctiolns� for the year 2000 <br />1 1 i 0 14 <br />developed in this study the County Road C/I'-35W interchange. An <br />I i Ol year 2010 forecasts a,n�di <br />differences between the M�elti ro poll 1- tan Counci <br />