My WebLink
|
Help
|
About
|
Sign Out
Home
2011_0110_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2011
>
2011_0110_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2011 4:15:18 PM
Creation date
11/4/2011 4:03:50 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
warn <br />This road is located within the Gras Lake Mitershe "District (GLWM�0),. GLWM�O requires that - <br />this project provide volume control f he slor ater runoff. This can • accomplished - <br />through the construction of infiltrati n tr cr and rain gardens within the Dale Street right- - <br />of- way. These basins may require reconst" ion every 10 0 years. M�onitoring wells would be <br />constructed in the infiltration trenches -er e when they need to be reconstructed. <br />In an effort to provide a level of pr torm water prior to discharging into the <br />infiltration areas, catch basins w'.-, e -h e ra depth. These "sumps" will capture <br />J040-N, <br />some of the sand and leaves V", <br />Malt are m wa runoff. By removing this material <br />at the catch basin, it Will make i m ponds, d improve water quality. <br />These sumps will re ui "'J"'.''annual clea added to ou Innual maintenance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.