Laserfiche WebLink
T*&. Steve Gatlin <br />City of Roseville <br />September 18, 1994F <br />Page 2 <br />DA <br />�1111 <br />#3 Add Alternate #2 for completingthe courtyard <br />0 <br />wall, and the security, gatedi ($381,720-00), • $459708.00 <br />#4 Add Alternate #3 for landscapingin, front <br />of the court yard wall on, the north, <br />and east sides.i ($ $57859.00 <br />#5 Add Alternate #1 for, the roof coveirhig the, <br />salt and fueling, areas. *2 ($321500.00) $88,410.00 <br />A, <br />2i. We wish to note the following item: the, oingbnal, estitnate was for 2500 square <br />feeti, and, the area bid was 7000 square feeit (,includiiig the fueling canopy), <br />41 # # <br />Add Alternate #10 for providm`g an irrigation <br />system Along the, north and pan ofthe east <br />($1 $3,500.00 <br />courtyard blouleviard,. *'31 <br />*,3 Base bid, for the buildffig provides, for the hook-up of the irriogattoon system. We <br />a Gi 0 <br />understand, that, ui a year or, so the whole Civic Center complex is to have an <br />irngation system, M'Stalled, and, we suggest that it, a11 be done at one th-ne. <br />#71 Add Alternate #5 for the exterior Wash-off Area,. *41 <br />($1 $157343-00 <br />*4 We suggest a clarification of the cost for this alternate be requested from the <br />Contractor pri *or to its rejection. <br />#8 Add Altemate #4 for a pre-engfixered mezzan "me, <br />storage area. *'5 ($122.)580.00) $30246.00 <br />*5 All structural requirements for the mezzanine are in the base bid and it may be- <br />e, <br />mstalled at any time although the lightning will have to be reworked mid is <br />included, fil the above price. <br />#9 AddAftemate #7 for, the installation ofan overhead <br />door M* the Roseville water storage tank# ($209000.00) $28,208 .00 <br />#110 We do, not sug,gest that Add Alternate #1,01 be accepted since we feel that the high <br />efficiency units are more cost', effective over the long run. <br />#11, In, addition, we, do not suggest that the Deduct Alternate #1,1 <br />for, the placement of eight 8" x 8' skylights *in I ieu <br />of an 8' x 120" continuous . skylight $79000.00 <br />1 ($ <br />