Laserfiche WebLink
City • Roseville <br />Project <br />3 L-07-05948A <br />April 7, 2008 <br />Page 2 <br />I <br />Based on the results of previous environmental investigations completed at the Site, petroleum -related <br />contaminated siolil will likely be encountered during the earthwork activities for building footings and <br />underground utility installations in the area of the former tank basins and product lines/dispensers, <br />located on the western portion of the Site. In adon, p etroleum-related contaminated soil from historic <br />land4reatment activities may be encountered on the eastern portion of the Site. <br />Vapor, mitigation measures will be taken to address potential soil vapor impacts from petroleum and <br />poltential noin-petr,ol eu�m -related contamination, as identified in limited concentrations in deep groundwater <br />samples collected at the Site. Specifically, a IFpassive it soil vapor extraction (SVE) system for potential <br />contam�nant vapors, (including piping and a vapor retarder) wiill be engineered and installed in the <br />subgrade beneath each of the proposed buildings,, with the exception of the proposed parking ramp. <br />Following completion of the buildings, soil gas from the soil vapor mitigation: system piping wil'f be <br />monitored for the presence of organic vapors with a photoionization detector and for explosive conditions <br />with an ex,plosimeter. One pre-occupancy and, four quarterly post-occupancy monitoring events will be <br />cojiducted. <br />In addition to the impacted soil and groundwater at the Site, asbestos-containing vermiculite insulation <br />was identified within the block walls of the existing two-story office and warehouse building. Because <br />thei asbestlos�containlng insulation cannot be removed cost effectively prior to demolition, all of the block <br />walls and associated building materials that are impacted by the asbestos-containing insulation will be <br />considered asbestos waste and handled/disposed off-site as such. <br />Environmental Costs <br />The following. is a surnmary of the approximate environmental costs and the proposed grant eligibl <br />environmental costs that will be incurred during redevelopment. i <br />Phase I Environmental Site Assessment $ 2,900 <br />Development Response Action Plan $ 2,000 <br />MPCA Fees <br />Total Pre-Development Cost 6,400 <br />Environmental Consulting $ 80,000 <br />Analytical Testing of Soil $ 35,000 <br />MPCA Fees $ 20X0 <br />Installation of Vapor Barrier and Vent System (65,1000 sf @ $2/sf) $130,000 <br />Asbestos, Abatement $115,000 <br />Soil Management and Disposal (I 0,1 00 tons @ $2 /ton) $253FOOO <br />Total Development Related Cost $633,000 <br />Totall Cost $6.399300 <br />