My WebLink
|
Help
|
About
|
Sign Out
Home
2011_1128_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2011
>
2011_1128_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2011 4:16:09 PM
Creation date
11/22/2011 2:00:54 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. PROJECT INFORMATION <br /> Opening Statement <br /> This Project Memorandum has been prepared and submitted in accordance with the approved <br /> Highway Project Design Development Process. <br /> Highway Section Description <br /> Termini <br /> County Road B2 (CSAH 78) From Cleveland Avenue (CSAH 46) to Snelling Avenue (TH 51) west <br /> interchange ramp (3730'; 0.71 Mi.) <br /> Adjacent Land Use <br /> The roadway section is adjacent to the Rosedale Mall regional shopping center, with ancillary <br /> retail uses surrounding the mall. At the west end of the project there is some office space <br /> interspersed with the retail uses, but the land use is primarily retail and restaurant. <br /> Road Usage <br /> Traffic volumes through the project area are affected by the usual peaks associated with <br /> high-traffic retail areas. The intersections with Snelling Avenue (TH 51), a Class A Minor <br /> Arterial- Augmenter, and Fairview Avenue (CSAH 48), a Class A Minor Arterial- Reliever are <br /> critical to the project and combine traffic patterns more typical of arterials with the patterns <br /> associated with the intense retail uses. The County Road B2/Snelling Avenue interchange and <br /> Snelling Avenue/TH 36 interchange are in very close proximity, with the centerline of County <br /> Road B2 located approximately 1,175 feet north of the TH 36 centerline where they cross TH <br /> 51. <br /> Horizontal/Vertical Alignment <br /> The vertical alignment is generally flat. The horizontal alignment winds around the north side <br /> of Rosedale Mall. <br /> Bridge Crossings <br /> There are no bridge crossings within the project limits. <br /> Railroad Crossings <br /> There are no railroad crossings within the project limits. <br /> Traffic Signals <br /> There are five signalized intersections in the project area: Fairview Avenue (CSAH 48), the <br /> northwest Rosedale mall entrance, Brooks Avenue, American Street, and Snelling Avenue (TH <br /> 51). Approximate signal spacing is as follows: <br /> ➢ Fairview Ave. to northwest Rosedale mall entrance- 375' <br /> ➢ northwest Rosedale mall entrance to Brooks Ave.- 525' <br /> ➢ Brooks Ave. to American St.- 725' <br />
The URL can be used to link to this page
Your browser does not support the video tag.