My WebLink
|
Help
|
About
|
Sign Out
Home
1989_0320_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1989
>
1989_0320_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2011 9:43:00 AM
Creation date
11/23/2011 9:41:11 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'o:, Steve, North, Acting pity Manager <br />From: Steven D.1 Gatlin, Public Works Director <br />Oel <br />Re: Fuel tank removal on Public Works grope y <br />Date: January, 2 7,r 1918 9 <br />Alsio, Braun was going to prepare a, cost estimate for the <br />necessary additional testilng and cleia,nup operation. In the <br />memorandum da,ted January 1,,2,, 'it was noted that the estimated cost <br />for the, complete cleanup oiperatioin was, inaicated as being $36,000 <br />1 <br />to, $38,000 including the cost for removal and reinstallation of <br />the, niew tanks,., This item was broken, down as follows: <br />,Tank replacement lone $ 2 6 �O 10 O <br />Contaminated soil removal $8F0100 to $10FOOO <br />Testing ffiwpft" $2, 000 to $3, 000 <br />Based on the work, plan proposed by Braun they indicate that "it <br />01 <br />will be necessary to take extensive borings and test soil samples <br />obtained from the boring's.i The borillngs will have to reach <br />
The URL can be used to link to this page
Your browser does not support the video tag.