Laserfiche WebLink
REQUEST FOR COUNCIL ACTION DATE: 9/12/88 <br />Department Approval: Manager Reviewed. Agenda Sectionl <br />- , iW141 ion: <br />01i t " Fire Station No. ',I Roof., <br />When F "Ire Station No. I 'was remodeled in 1978,, new roof ing (Trocal Pvc <br />membrane by Dyniamite, Nobel) was installed, which had a ten year warranty <br />In the firstyears after installation, a few leaks developed and were <br />rel:)airied by Nobel, at no cost to I <br />During the, Fall of 1987 and into 19881the company was called numerous <br />times to repair problems. it reached, the point where the company was <br />unable to repair the leaks, <br />In May, the City, CouncilL1 authorized Short, Elliotty Hendrickson (SEH) <br />to complete an investigat report on the condition of the roof <br />In June the, Dynamite Nobel Company submi tted a proposal to the cl* ty <br />for reroofing the station for $7,,200.00 to $71800e00, depending on <br />what type ofwarranty 'I's desired,, <br />The city attorney 'indicates that if the Council rejects the offer of <br />Dynamite, Nobel for a, new PVC membrane roof,, we would proceed with the <br />lawsul, <br />,it and, seek damalges,, <br />0 <br />Also attached, is, the SEH roof investigation studyw The study found, <br />through a moisture survey completed by Twin City Testing, that the <br />1i 01 <br />roof ing insulation is, not wet,, The study, also reviews two options • <br />