Laserfiche WebLink
00�. <br />2 September 12,1 1988 <br />91 <br />the Dlynam ilte Nobel proposal f or replacing the roof w 10th new pvc <br />membranie., One option would, be a fou,rpily buialt-up roof, costing <br />approximately $1918010*00, The second option would be a EPD14 <br />(rubberized) membrane rooif at an approximate cost of $23,,400.00. <br />The Fire Chief and Chief' Code Enforcement Officer have reviewed <br />Dynamite, Nobelfs proposal, and, based an the ciltyls experience with <br />the Troical r,00f,i both recommend the proposal not be accepted. They <br />recommend, the option, of a built-up rolof. <br />The study flurthier sugigestsi that the structural capacity of the roof., <br />,around, the roof top unitsr be investilicrated, because of the deflection <br />of the wood oistis under the weight of tihe units. This investigation <br />1 .01 <br />di 0 <br />should be completed prior to installation of new roofing. <br />It is recommended the Council take the followin <br />Authorize Shorti, Elliott,, Hendrickson to conduct an investigation <br />of the Fire Station No. I roof structure around the roof top units <br />a <br />,at a, maximum cost of $800,.00,, to be funded from the Contingency <br />Account. <br />I <br />Ell A, Authorize Short, Elliott, Hendrickson to prepare specifications <br />for a new built-up roof for Fire Station No, 1, at a maximum cost <br />of $1jr800 'to, be funded, from the Continglency Account. (The <br />reroofing, would not be completed until it was determined if any <br />replai,rs were required to the roof sit,ruicture around the roof top <br />u itso <br />ni <br />