Laserfiche WebLink
C'hr is Seigle <br />N�ovember , 1988 <br />Page 3 <br />o, Assumptions regardin�g the,, dirlectional orientation of traffic which is <br />generated by the project. <br />The traffi I g�en�eratiion of the, project, was considered in terms of the peak traf- <br />c <br />el <br />fic holu�r on Lexington Avenue (14:130 PM to 5*30 PM) and the peak inbound and olut-i <br />1 0 <br />bound trlaff*c generation periods of tihe project. (7:30 AM to 8:00 AM and 2l.W00 Pm <br />d 'N <br />to, 21:30 PM�,, respectivelyla) Traffic generation o of these perl I o d'il s I i S <br />lelisciribed bellow. <br />