Laserfiche WebLink
Ygp:i <br />I Now <br />Central Park - Roseville, 311 19,88 <br />The base, map will be a 100' compos' <br />ite suitable for plannm` g Purposes onli <br />The site anaiysis will be a colored and mounted print of' the blase map. <br />a <br />The CONSULTANT will attend the first combined meeting with Park Staff,, Board an <br />Foundation at the end of Phase 1'. 1 <br />a <br />The CMi will be responsible for gathering and proling at their own, expense and at the <br />correct. scale any, records and plans n' eeded by the CONSULTANT m the preparation of the <br />blase map-The CONSULTANT will acquire a, reproducible of <br />the latest Mark Hurd ortho <br />contours and, topographyi (A Mark Hurd" verbal estimate of $13715,iOO is included M" Phase <br />[ago <br />A. Research LIMIT 8 H'RSi. <br />B. Analysis LIMIT' 8 HRS,. <br />C. Synthesis, LIMIT 8 H'IRS4 <br />D. Materials and clerical <br />it <br />I <br />o rop a <br />�A list, f posed, �facilitiesi based, on past plans,, CrrY recommendations and <br />CONSULTANT' analysis will be, prepared. <br />The CITY sh,all provide the CONSULTANT' With, a fisit', of city standards, ga <br />ols, prioriti <br />2nid budget constraints 1 n es <br />J 161 rx-61TO <br />A. Design and -draftingi <br />I LIMIT' 12 HRS.1 <br />B. Staff meeting consultants office <br />Materials <br />Vi <br />A, marker on tracmg plaper concept plan overlay showing general relationships of program <br />items on the'site in blob fonn will, be prepared. <br />PHASE IVv PRELIMWARY SKETCH MASTER PLAN <br />A. Design LIMIT16 <br />B. Draft Meg LIMIT 6 HRS. <br />I <br />C, Staff meeting consultants office (1) <br />D. Cost analysis LIMIT 8 HRS,. <br />E. Materials <br />