Laserfiche WebLink
&"4 - <br />entral Park - Roseville, 311" r h 1988 <br />0.1m <br />A freehand marker on tracing paper preumm,a,ry sketch master plan wfll be prepared. <br />• prelimm'ary "BALL PARK' development cost estimate based on rou,gh area estimates <br />taken from, the, prelimm*ary sketch master plan will be prepared <br />lb,ei CONSULTANT will attend a final combined meet,mog with Park Sitaff, Board, and <br />Foundation at the end of Phase, IV, <br />The CrrY'shall be responsible. for prov'I'ding legal, engiffieerm'g, surveying services and <br />0 41 <br />Mformation as listed above, or, as, may be required. lb,e CONSULTANT shall work ion <br />close haison mdth these, ciperts. throughout the course of the project. None of these <br />services will be, requested, without prior, consent from the C=. <br />di <br />While, the actual time requxed to complete the study wi1l be subject to change, we <br />11 <br />estimate that this work wfll take between sLxty (60�), and nmety (90) days, to complete. <br />101113 <br />The cost of our services will be as listed below., The cost of our services will be billed <br />my is I I <br />mont m accordance with the attached' Standard Rate Scheduleol <br />Phase I *includes a, cost estimate (verbal estimate of'$'1375.010, 28 January 1988) for an <br />orthographic and contour tracing to be prepared by Mark Hurd, Inci The actual cost of <br />this item will be billed., <br />PtIASE I. <br />I <br />$13180,0.0O <br />PHASE II., <br />$11250�.00 <br />PHASE 1H., <br />$750.00 <br />PHASE <br />$1650 00 <br />TOTAL $745100 <br />