Laserfiche WebLink
Department Approval, <br />11111 111 <br />6 1, <br />30�Ul-eli sawm1w, <br />ITEM NO.: F 3 <br />Ltem Description: Feasiblielity study and project approval for <br />Project. P-88-111r curb and gutter for County <br />Road D at Centre Pointe Busi*ness Park <br />a <br />At the last clouncil meeting, the council received a peti"tion fr'o'm the <br />Centre Point e Blusines,si Park requesting the construction of curb and <br />gutter along the south slide of County Road D between I-35W and Cleveland <br />Avenue,. The petitilon was 1010% signed and requested only the con- <br />struc,t,ion of curb and, gutter and associatied work on the south side of <br />the streelts <br />'The feiasibi,lir..Y study has now been compi I leted,, and the project has been <br />found, to be, feasible. The appropriate, step would now be to accept the <br />f'easiblill"ity report and to approve the project as well as order the <br />VI <br />preparation of plans and speci f ications, <br />RECOMMENDED COUNCIL, ACTION': <br />Adoptioln of a res�oluti,on receiving the f'eas ibility report and ordering <br />a <br />improvement, P-i8,8-11 and instructing the Public Works Department to <br />prepare the necessary plans and spec if 1"cations f or this proi ec t. <br />.0 <br />