Laserfiche WebLink
0 <br />COPY <br />■ <br />CONSULTING PLANNERS <br />LANDSCAPE ARCHITECTS <br />300 FIRiST AVENUE NORTH <br />SUITE 210 <br />MINNEAPOLIS., ININ 1-5,1401 <br />6121,-3,39'-33100 <br />9929BINUM <br />Hionorable Maylor and Council embiers <br />City of Roseville <br />2660 Civic Center Drive <br />RoseOtlle, MN 55113 <br />RE: Arela, Planning Study <br />Dea,r M yor and i u �nc"'I,m,emb�erIs. <br />The completion of the planning study which, our office has underta'ken in <br />clonjunction with City Staff for the area, between Cleveland and Snelling <br />Avenues on County, Road C has been delayed b�eyo�nd our orliginal expectations. <br />Since the compleio�n, time for, the study was outlined 'in our cliontract, we 6re <br />siubmittIng for, your consideration a Letteir of Addendulm to the contract which <br />sets a, new timetable for completion of the,, remaining worki, <br />1here are several, reasons wh�yi th�e studa] has been dela, <br />47) $1 0 <br />Am During this same time period, I experienced an overwhelmingly increased <br />work load with cou�rit cases that, we wier,e involved with in our offi, ce4l <br />Many of you are already aware that tIhi - is is a major part of my <br />cionsulting work, I do not have control over the sich,edu�ling of court <br />dates and the casiels sometimes arie delayed resulting in several cases <br />being sc�heduilled during a, short peiriod. <br />The Roseville vsi. Kehr case was con�ducted during this study period, <br />I <br />having been extended from previous, daties. <br />It was undersitood that I would be integrally 'Involved with the study and not <br />Sincle, th,eise ems above required <br />mpily have my, staff planne, rs do the work. <br />my personal time and attention, the planning study has been delayed. <br />