Laserfiche WebLink
-V <br />R"O.MEVILLE M�AY'OR AND COUNCILMEMBERS 7120/87 Pag�e I, <br />Subsequent to consultation with the Engineering Staff, we prepared a <br />preliminary set of' -optional circulat-lon and land use stud,ieis as <br />a bas"Is for a <br />�t t,ria,f'fic study by Barton-Asichman. Tlh,eiir results,, too, are overdue and %�z, <br />a it th�ese results before proceed't'ng with more detaRed and final aptions on <br />wa,l <br />land use and circulation solutions. <br />S1 <br />T'heii revised' taime table, attached to the Le�ttier of Addendum reflects a <br />reaflostic and achievable schedule for ourselves and the, City Staff to work <br />toward the culmination of the study. Having gotten through the- h,eav'y work <br />I <br />load in the,, la,sit, two months,, we are now "in a position to actively pursue the <br />completion of the study in a timely, fashion, <br />Sincerely, <br />[0 * M 11 A M 0 Ills , V, <br />I 1� , I AND UBIA,N,, 1NC, <br />Howard Dah1grej- <br />11-1iresident <br />