Laserfiche WebLink
P we <br />'Change Order No. 1, <br />McCarrons Lake Water QuallotY Improvement <br />"PA Project No, C27 S-005508-0211 <br />This cha,nge order embodies the following changes, none of which substantially <br />a,lters the scope or the objective of'the prloject. <br />n 1 1 <br />The site contains i suff*c'ent, material for berm construiction. Borlrow <br />material is available at nolm�i 5 nal cost from another C*ty piroj'ect. This <br />a I I <br />imported material will be used to construct the sedimentation basin berm, <br />the outlet berm, and berms 1,, 21 3.) and 4, <br />4 <br />2) A, manhole will be added to the discharge pipe at the out,let berm. This <br />manhole will be added to facilitate water quality monitoring of wetland <br />ef'f'l uent . <br />8) The Sedimentation basin construct1on included tihe placement, of a gabion <br />A structure to control channel erosion northwest of the basin. The nature <br />46 0 <br />and extent of organic sofl in this area has resulted in a continuing, <br />erosion problem around the gabions, This, extra work colmpr4sies stel,el <br />4 <br />sheeting to cut off' water, whi"ch has caused erosion around t1he gablions. <br />