Laserfiche WebLink
The additional costs under this charge order are sum�mariized as follows: <br />Schedule 6.000 - Change Odder 1 <br />Estimated, <br />Unit <br />N�o. <br />item <br />Unit <br />Oulantit, <br />Price <br />Extension <br />1 <br />Imported material for berms C. Y. <br />41200 <br />2. 0 0 <br />8.) 40�0. 00 <br />2 <br />Manhole & RCP in outlet <br />Ea. <br />1 <br />1 13 1,8.9 5 <br />1131,8. 95 <br />berm <br />3 <br />54," CMP Inflow to <br />C, F. <br />47 <br />159.00 <br />$ 7747'3.00 <br />Sedimentary Fl Basin <br />4 <br />54" CMP F'l an End <br />Ea <br />2,1$15001. <br />1500.00 <br />5 <br />6 "' CMP & Fl aced Ends <br />Ea, <br />1 <br />59521.40 <br />$ 5, 5'21.40 <br />in Lieu of Bridge <br />6 <br />Rip-Rap i @ 5 "' CMP <br />SY <br />50 <br />45.00 <br />$ 21250.00 <br />71 <br />Lower 12" CMP <br />Ea <br />6153,.,34 <br />$ 6153.34 <br />8 <br />PI anti n <br />LS <br />241150.00 <br />$24,11150�. 00 <br />9 <br />Channel Stabilization <br />LS <br />1 <br />2 700. 00 <br />$ 911700. 00 <br />Method of Payment: Imported <br />mat i al for berm construction will ibe paid for <br />at the <br />agreed unit price per <br />cubic yard,. <br />Measurement for, payment will be <br />based <br />upon a, count of 10 cubic yard t,ru loads delivered to, the <br />slate. <br />