Laserfiche WebLink
CHAIqGE ORDER N0.1 2 *SIGN AND RiE RN TIM CHANGE ORDER TO THE <br />ARCHITECT,, Upon receimpt Of SL copy of this Change Order executed by Contractor and Owner <br />A" <br />Uointractor is directed to make the following changes., <br />11111 Grieenfi"Lfld from the circul"'lt panel to new electrical, box at the top <br />face of the Bands had l., Wire for one circuit from the electric panel to <br />the new, box at th�e top, of the band shell, ADD $165-00 <br />0 <br />Cost for ref locatirig the transformer. <br />ADD $153.00_ <br />TOTAL ADD $3l8e00 <br />0 0 <br />Total RevIsed Contract. Sum including th,is Changle Order $1509508.33 <br />Me, <br />M, <br />I U- is <br />commended by Buetow & Associa-tes,-Inc-. <br />