Laserfiche WebLink
3 4. Determine the appropriate travel patterns shifts with County Road C2 connected between <br />34 Griggs Street and its current termination point. Develop traffic volumes based on current <br />35 levels of traffic and future year 2030 projections at the followin g key intersections.- <br />36 0 County Road C2 and Lexington Avenue <br />37 0 County Road C2 and Hamline Avenue <br />38 0 Josephine Road and Lexington Avenue <br />39 0 Josephine Road and Hamline Avenue <br />40 0 Lydia Avenue and Hamline Avenue <br />4 ,i 5. Analyze a. u.. and p.m. peak hour intersection operations at the four key intersections with the <br />42 potential County Road C2 connection under current traffic volume conditions and future year <br />43 2030 conditions. <br />44 6. Review the roadway design feasibility and impacts associated with constructing the <br />45 County Road C2 connection. This review will include roadway grades, sight lines, potential <br />46 capacity needs and functional classification assessment. <br />47 The study would take about 4 weeks to complete. <br />48 Once the study is complete, the findings would be presented at a public information meeting. <br />49 Notices for the meeting would be sent out to property owners in the study area. <br />Finally, the study findings would be presented to the City Council at a regular meeting. These <br />'i meetings could take place this summer. <br />52 POLICY OBJECTIVE <br />53 County Road C-2 has never connected between Griggs and Lexington Avenue. However, it is <br />54 on the City's Municipal State Aid System and is functionally classified as a Local Collector. <br />55 The same is true of Josephine Road. The purpose of this study is to determine what the local and <br />56 regional impacts of connecting County Road C-2 between Hamlinc Avenue and Lexington <br />�` 7 Avenue. <br />58 FINANCIAL IMPACTS <br />59 The cost to have SRF complete the Origin Destination Study and subsequent public meetings is <br />6('-) $,14,,000. This includes completion of all of the tasks described above. The study could be <br />6 1 funded by the street construction fund or general reserves. <br />62 STAFF RECOMMENDATION <br />63 Discuss County Road C-2 traffic study and provide staff direction. <br />64 REQUESTED COUNCIL ACTION <br />65 Discuss County Road C-2 traffic study and provide staff direction. <br />66 <br />Prepared by: Debra Bloom., City Engineer <br />Attachments A: Location Map <br />Page 2 of 2 <br />