My WebLink
|
Help
|
About
|
Sign Out
Home
2011_0516_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2011
>
2011_0516_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2012 1:34:40 PM
Creation date
12/21/2011 1:35:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k,14L& <br />MEQUEST FOR COUNCIL ACTION <br />Date.- 5/16/11 <br />Item No..- 7.c <br />Department Approval City Manager Approval <br />10" <br />Ar <br />Item Description.- Approve Agreement between Minnesota Commercial Railway and the City of <br />Roseville for Work at Dale Street Railroad Crossing <br />BACKGROUND <br />2 As a part of the Dale Street Reconstruction project, it is necessary to make improvements at the <br />3 Minnesota Commercial Railway crossing. The improvements include, the installation of a new concrete <br />4 and rubber crossing surface and the relocation of the existing crossing signal. <br />5 The replacement of the crossing surface is necessary because the existing surface is badly deteriorated. <br />6 The new surface will be smoother and quieter. The signal needs to be relocated as a result of the <br />"7 reconstruction of the watermain. The existing location of the signal is directly on top of the watermain <br />to be replaced. It would be difficult to complete the replacement work without relocating the signal. <br />9 This railroad is operated by Minnesota Commercial Railway. Their crews perform all work on the <br />'10 crossings and equipment on this railroad. <br />POLICY OBJECTIVE <br />12 Minnesota Commercial Railway has prepared the attached Crossing Surface Installation Agreement to <br />13 outline construction cost participation and future maintenance responsibilities. The cost participation <br />14 proposed in this agreement is the same as other railroad work. A copy of the agreement is attached. <br />1 f.t This has been reviewed by the City Attorney. <br />1 FINANCIAL IMPACTS <br />1 7 The cost to perform this work is the responsibility of the City of Roseville. However, upon completion <br />1 ,,, of the work Minnesota Commercial Railway shall maintain and keep in repair the improvements. <br />'19 The work is estimated to cost a total of $,90,,358.20 and would be paid for using the City's Municipal <br />20 State Aid funds. <br />21 STAFF RECOMMENDATION <br />22 Staff recommends that the City Council approve the attached agreement. <br />23 REQUESTED COUNCIL ACTION <br />24 Approve Agreement between Minnesota Commercial Railway and the City of Roseville for Work at <br />Z, Dale Street Railroad Crossing. <br />NMI <br />Page I of I <br />
The URL can be used to link to this page
Your browser does not support the video tag.