Laserfiche WebLink
equipment which is installed on premises owned, controlled or leased by the <br />Grantee,, for unauthorized access to Grantee equipment which is installed on <br />premises owned, controlled or leased by the Grantor. The parties agree that the <br />Grantor shall have no liability for any loss,, cost,, expense or damage sustained by <br />the Grantee if any unauthorized third party gains access to the City Network (and <br />any voice, video and/or data transmissions carried thereon) through the Grantor, <br />or their respective equipment. <br />E. All data collected,, created,, received,, maintained,, or disseminated for any purposes <br />in the course of the Grantor's performance of this Agreement is governed by the <br />Minnesota Government Data Practices Act,, Minn. Stat. Chapter 13, or any other <br />applicable state statutes, any state rules to implement the Act, as well as federal <br />regulations related to data privacy. The Grantor agrees to abide by these statutes,, <br />rules,, and regulations. <br />Ill. SCOPE OF GRANTEE RESPONSIBILITIES <br />A. The Grantee is permitted to use the Fiber Capacity under the terms of this <br />Agreement and agrees that it is solely responsible for the purchase, installation, <br />operation, maintenance, management,, testing and monitoring of any equipment it <br />connects to the City Network. The Grantee shall not utilize the Fiber Capacity for <br />any unlawful purpose. <br />B. The Grantee agrees to exercise due care and caution to protect City Network <br />facilities,, fibers,, cables and equipment from damage, vandalism and other <br />potential problems. The Grantee agrees that it is responsible for the direct and <br />indirect costs of repairing any damage to City Network facilities, fibers, cables <br />and equipment that is directly or indirectly caused by the Grantee (and/or its <br />contractors or subcontractors), whether intentionally or unintentionally. An <br />example of such damage includes, but is not limited to, equipment installation by <br />the Grantee that could damage a Grantor patch panel, Grantor equipment or <br />Grantor facilities. <br />C. The Grantee's use of the Fiber Capacity shall not at any time interfere with the <br />use of the City Network by the Grantor, and other users. Upon receiving oral or <br />written notice from the Grantor,, the Grantee shall immediately cease using the <br />Fiber Capacity for any purpose that the Grantor, in its reasonable discretion, <br />determines is interfering with City Network systems. The Grantee agrees that it is <br />responsible for the direct and indirect costs of remedying any interference caused <br />to other City Network systems as a result of the Grantee's installation of <br />equipment or the Grantee's use of the Fiber Capacity. <br />D. The Grantee shall at all times use reasonable efforts to protect the security of the <br />City Network. For purposes of this paragraph,, '"to protect the security" means to <br />protect those physical elements of the City Network under the Grantee's control <br />from unauthorized intrusion,, signal theft, tampering, wiretapping or other actions <br />that might: (i), compromise the integrity of or degrade the signals carried over the <br />City Network; or (11 ), result in the unauthorized interception and disclosure of <br />