Laserfiche WebLink
Regular City Council Meeting <br /> Monday,December 05, 2011 <br /> Page 8 <br /> How the proposed amount of CIP spending was identified <br /> At the request of Mayor Roe, Finance Director Miller advised that there had no outside <br /> consultant tapped for a city-wide picture of CIP needs, but that staff had been tasked by <br /> department to look at their capital and infrastructure needs, and based on its useful life, <br /> industry experience and replacement schedule, a comprehensive CIP list had been devel- <br /> oped and later prioritized by a CIP Task Force made up of several City Councilmembers <br /> and senior several staff members. On a parallel course, Mr. Miller noted that outside <br /> consultants had been hired as part of the proposed bond issue for the City's aging fire sta- <br /> tions, and advised that this information from those multiple studies over the years had <br /> been factored into the CIP Task Force investigations as available. <br /> City Manager Malinen also noted that, as part of the public vetting or review process, the <br /> City's Public Works, Environment and Transportation Commission had reviewed the <br /> proposed utility rates coming out of the CIP Task Force process and recommended those <br /> rate levels as well. <br /> Mayor Roe noted that he and Councilmember Johnson had participated in the CIP Task <br /> Force review. Mayor Roe noted that before he came on the City Council, the City had <br /> instituted a five (5) year CIP, and in the mid-2000's that had been extended to a ten (10) <br /> year period to provide a better long-term view. As part of the Task Force's recommenda- <br /> tions received earlier in 2011, Mayor Roe noted that this projection had been expanded to <br /> twenty (20) years, even though his preference had been to go even longer to address the <br /> cyclic nature of CIP needs; however, he noted that the twenty (20) year timeframe had <br /> served to open the City Council's eyes to the magnitude of the problems faced by the <br /> City and how this shortfall had developed over the years with past City Council's only <br /> looking at needs from a five (5) year perspective and not providing a sufficiently clear <br /> long-term picture. <br /> Alternative sources of revenue for utilities and the base fee side of utility rates <br /> Mayor Roe clarified the function of the City's utility structure that base rates were used <br /> for fixed costs and infrastructure, and use fees addressed costs for water purchases from <br /> the St. Paul Regional Water Authority and sewer treatment costs of the Metropolitan <br /> Council. <br /> Finance Director Miller advised that the most viable alternative resource other than in- <br /> creasing base rates would be increasing usage rates; however, he opined that this would <br /> make the City more reliant on using water to fund its infrastructure. If the City wants to <br /> encourage water conservation, Mr. Miller advised that the situation would develop that <br /> those very conservation efforts would continually reduce the revenue source to keep the <br /> system upgraded and not providing a stable revenue source, thus shifting the burden and <br /> incenting people to use more water, specifically contrary to a conservation-based struc- <br /> ture and the philosophy of water conservation. <br /> limmiiiimimmimlimiiiillimmmiliii <br />